1. Hand and Arm Vibration:
1. Contract hire management is mandated for all assets as equipment used on a project.   Equipment includes plant and tools.
2. A project does not own any equipment and so all assets needed on a project must be hired.
3. Equipment must be inspected daily by each operative as part of their Daily Prestart Checklist.
3. Equipment must be inspected weekly by the Site Manager and an inspection report recorded.

7. Hand and Arm Vibration Register:
1. The project plan and project RAMS define the list of assets used by a project.
2. The project plan includes that asset register of equipment including cost schyedule.
3. The project plan is dynamic with planned and acctual delivery, off-hore and collected dates.
3. The project plan show the daily cost to the contractor and the daily cost to the project that may be cost plus a percentage.

9. Intellectual Property (IP):
1. Hand and Arm Vibration Register and the Inspection Reports become valuable Intellectual property that is transferred to the client.

Document Control.
1. Document Title: Hand and Arm Vibration.
2. Description: Hand and Arm Vibration, policies and guidelines.
3. Keywords: Hand and Arm Vibration, policies and guidelines.
4. Privacy: Shared with approved people for the benefit of humanity.
5. Edition: 1.1.
6. Issued: 2 Jan 2018.