| BIM Hand and Arm Vibration | | |
|---|
| 1. Hand and Arm Vibration: | | 1. Contract hire management is mandated for all assets as equipment used on a project. Equipment includes plant and tools. | | 2. A project does not own any equipment and so all assets needed on a project must be hired. | | 3. Equipment must be inspected daily by each operative as part of their Daily Prestart Checklist. | | 3. Equipment must be inspected weekly by the Site Manager and an inspection report recorded. |
| 7. Hand and Arm Vibration Register: | | 1. The project plan and project RAMS define the list of assets used by a project. | | 2. The project plan includes that asset register of equipment including cost schyedule. | | 3. The project plan is dynamic with planned and acctual delivery, off-hore and collected dates. | | 3. The project plan show the daily cost to the contractor and the daily cost to the project that may be cost plus a percentage. |
| 9. Intellectual Property (IP): | | 1. Hand and Arm Vibration Register and the Inspection Reports become valuable Intellectual property that is transferred to the client. |
| Document Control. | | 1. Document Title: Hand and Arm Vibration. | | 2. Description: Hand and Arm Vibration, policies and guidelines. | | 3. Keywords: Hand and Arm Vibration, policies and guidelines. | | 4. Privacy: Shared with approved people for the benefit of humanity. | | 5. Edition: 1.1. | | 6. Issued: 2 Jan 2018. |
|
|