Project[SITE_NAME] Location[SITE_POSTCODE]
Client[CLIENT_NAME] Date[DATE]
Supplier[CONTRACTOR_NAME] Day[DAY]

#TypeSubjectWho
1Document EmailTest MailSM
Test email with the quick brown fox jumps over the lazy dog in blue jeans. Send to John to verify his phone is working as expected.
2CollectionWaste disposalSM
Grab lorry arrived at 11:45 to take the first load of debri from excavation F21 in the north-east corner. Care taken to slowly direct the driver to a safe working location between excavations. More debri scheduled to be collected later today.
3Work PackageExcavation F24SM
In accordance with drawings, excvation F24 on the north side of the site was started within an area marked and verified as 1.5 meters by 1.5 meters. This excavation will be to 1.2 meters without any side shoring up. Watchman assigned to attend outside the excavation barriers until the excavation can be covered with the plywood provided.
4Task NoteTest CubesSM
Site Manager ensured test cubes of the concrete were collected for certification by the applicable company. Three test cubs for each concrete pour were clearly marked and provided for collection.
5Asset InspectionExcavation BarriersSM
Supervisor verified that adequate number of barriers were on-site for the excavations scheduled for the current week. The barriers are in reasonable condition and fit-for-purpose.
[NR][TASK_TYPE][SUBJECT][INITIALS]
{MESSAGE}

Document: DTL.   Edition 181202.