Project | [SITE_NAME] |
Location | [SITE_POSTCODE] |
Client | [CLIENT_NAME] |
Date | [DATE] |
Supplier | [CONTRACTOR_NAME] |
Day | [DAY] |
Asset Register |
---|
Assets needed to be assembled before the AAAX3 project is scheduled to begin. |
nr | Asset | Quantity | State |
101 | Construction safety signage | 3 | Ready |
102 | Carpet protector rolls | 3 | Ready |
103 | Plastic dust sheets | 12 | In-Stock |
104 | Rolls of silver tape | 2 | In-Stock |
105 | 5 KVA Transformers | 2 | On-Hire |
106 | Box of ear plugs | 1 | Ready |
107 | Box of P3 dust masks
| 2 | Ready |
108 | Laminated exclusion zone signs
| 6 | In-Stock |
109 | Laminated high noise signs
| 6 | In-Stock |
Assets must be counted when delivered to the clients site and must be counted when collected from the client site.
Delivery and collection tasks are mandated to manage the location of all assets.
|
---|
Document: SAL. Edition 180912. |
---|
|