Project[SITE_NAME] Location[SITE_POSTCODE]
Client[CLIENT_NAME] Date[DATE]
Supplier[CONTRACTOR_NAME] Day[DAY]

Asset Register
Assets needed to be assembled before the AAAX3 project is scheduled to begin.
nrAssetQuantityState
101Construction safety signage3Ready
102Carpet protector rolls3Ready
103Plastic dust sheets12In-Stock
104Rolls of silver tape2In-Stock
1055 KVA Transformers2On-Hire
106Box of ear plugs1Ready
107Box of P3 dust masks
2Ready
108Laminated exclusion zone signs
6In-Stock
109Laminated high noise signs
6In-Stock
Assets must be counted when delivered to the clients site and must be counted when collected from the client site.
Delivery and collection tasks are mandated to manage the location of all assets.
Document: SAL.   Edition 180912.