Project[SITE_NAME] Location[SITE_POSTCODE]
Client[CLIENT_NAME] Date[DATE]
Supplier[CONTRACTOR_NAME] Day[DAY]

#ObjectProcedureRating
1IdentificationHas the project been added to the shared BIM common data environment as policy?Good
2Method StatementHas a method statement been documented, verified and approved by qualified people?Good
3SupervisionHas the site manager and appropriate levels of supervision been identified and responsibilities assigned?Good
4Statutory NotificationsAre any statutory notifications needed and has it been confirmed that these have been acted upon?No Data
5Emergency ArrangementsHave all accident and emergency arrangement been documented with details of how best to get to Hospital?Good
6First AidAre first aid facilities and people available with first aid training?Good
7Access and EgressHas the workplace got adequate signposted means for access, egress and evacuation?Good
8Equipment ListHas an equipment list with HAV limits been identified and notified to relevant people?Good
9Public ProtectionHave arrangement been made to protect others from activities in the work place?Good
10Deliveries and CollectionsHas a schedule of deliveries and collections been agreed with the client and Site Manager?Good
11Risk AssessmentHas a risk assessment been documented for the activities scheduled?Good
12TrainingHas training, toolbox talks and education been provided to ensure competence of the people involved?Good
13Person Protective EquipmentHave standards been agreed regarding the specific personal protective equipment that must be worn?Good
14Hazardous SubstancesHas an inventory of hazardous substances been prepared with any COSHH assessments as needed?No Data
15EnvironmentHas the environment of the work place been assessed with the impact on how the work can be undertaken?Outstanding
16EnvironmentalHas an environmental assessment been undertaken regarding wild life, water flow, vegetation and waste?Not Applicable
17PermitsHave all permits required been planned and issued to the responsible people?Good
18Specific PermitsHave all special permits such as PASMA, IPAF, MEWPS, Confined Space, Hot Works been issued?No Data
19Lifting OperationsHave lifting operations and lifting equipment been certified and training provided?Good
Project site initiation is a mandatory procedure that will cause many site documents to be authored when relevant.
Document: SID.   Edition 180607.